
Valves & Fittings
Commercial UPVC Sch-80
Schedule 80 UPVC manifolds, unions, and throttling valves handle pressurized pre-filtration racks, concentrate recirculation loops, and vessel distribution headers in 250 to 10,000 LPH commercial plants.
All Valves & FittingsPush-Fit FittingsCommercial UPVC Sch-80Flow RestrictorsCheck, Solenoid & ASOVLLDPE Tubing & Strainers
Commercial UPVC Sch-80


Compact Ball Valve 1.1/2-Inch UPVC Sch-80 Hydroplast

Compact Ball Valve 1.1/4-Inch UPVC Sch-80

Elbow 1-Inch (UPVC Sch-80 Hydroplast)

Elbow 1-Inch 45° (UPVC Sch-80 Hydroplast)

Elbow 1.1/2-Inch 45° UPVC Sch-80 Hydroplast

Elbow 1.1/2-Inch UPVC Sch-80 Hydroplast (Fitting)

Elbow 1.1/4-Inch UPVC Sch-80 Hydroplast

Elbow 2-Inch UPVC Sch-80 Hydroplast

End Cap 1-Inch UPVC

Flange 1-Inch UPVC (Sch-80 Hydroplast)

Hydroplast Grey Solvent 479ml (PVC Jointing Cement)

Socket Female 1-Inch UPVC (Sch-80 Hydroplast)

Socket Female 1.1/2-Inch UPVC Sch-80 Hydroplast

Socket Female 1.1/4-Inch UPVC Sch-80 Hydroplast

Socket Female 2-Inch UPVC Sch-80 Hydroplast

Socket Male 1-Inch (UPVC Sch-80 Hydroplast)

Socket Male 1.1/2-Inch UPVC Sch-80 Hydroplast

Socket Male 1.1/4-Inch UPVC Sch-80 Hydroplast

Socket Male 2-Inch UPVC Sch-80 Hydroplast (Fitting)

Socket Plain 1-Inch (UPVC Sch-80 Hydroplast)

Socket Plain 1.1/2-Inch UPVC Sch-80 Hydroplast

Socket Plain 1.1/4-Inch UPVC Sch-80 Hydroplast

Socket Plain 2-Inch UPVC Sch-80 Hydroplast

Tee 1-Inch UPVC (Sch-80 Hydroplast)

Tee 1.1/2-Inch UPVC Sch-80 Hydroplast

Tee 1.1/4-Inch UPVC (Sch-80 Hydroplast)

Tee 2-Inch UPVC Sch-80 Hydroplast (Fitting)

Union 1-Inch (UPVC Sch-80 Hydroplast)

Union 1.1/2-Inch UPVC Sch-80 Hydroplast

Union 1.1/4-Inch UPVC Sch-80 Hydroplast

Union 2-Inch UPVC Sch-80 Hydroplast

Commercial & Industrial UPVC Schedule 80 / CPVC

Sanitary SS316L Tri-Clamp Valves, Sample Ports
Selection & Fitment Checks for Commercial UPVC Sch-80
- Use genuine UPVC primer and heavy-duty solvent cement on Schedule 80 sockets and cure fully before hydrotesting.
- Place true-union ball valves before and after vessel trains so filter housings isolate cleanly during maintenance.
- Never throttle multistage pumps completely dead-head; leave minimum concentrate bypass open per pump curve.