

Union 2-Inch UPVC Sch-80 Hydroplast
2-Inch Schedule 80 UPVC O-ring union (Hydroplast) built for high-wall chemical and pressure resistance on commercial RO skids.
Thick-walled Schedule 80 unplasticized PVC body handles aggressive salt, chlorine, and CIP cleaning solutions plus continuous skid vibration far better than thin household Schedule 40 plumbing. Threaded collar with an EPDM O-ring lets technicians unbolt pumps, UV chambers, or FRP valves without sawing glued piping.
Application Scale & Replacement Verification
Compare housing dimensions, port diameter, and membrane GPD capacity before ordering spares or requesting local dealer quotes. Verify System Fit in Water Planner →
Key Technical Specs
| Manufacturer / Series | Hydroplast |
|---|---|
| Standard Format | UPVC SCH-80 |
| Port / Connection | 2-Inch |
| Application Duty | Commercial / Industrial |
Right Fit When
- Commercial RO pre-treatment, concentrate, CIP, and permeate manifolds using 2-Inch Schedule 80 UPVC pipe.
- Inline isolation ahead of multistage pumps, UV chambers, and flow meters.
When To Skip or Double-Check
- Do NOT glue Schedule 80 UPVC to hot water lines above 55°C or install directly onto high-pressure 4040/8040 RO discharge headers exceeding 200+ PSI—use SS304/SS316 stainless on high-pressure RO outlets.
Signs This Part Is Failing
- Drip around the threaded union collar (missing or pinched EPDM O-ring)
- Socket joint weeps when pressurized before solvent weld cures completely
- Sagging or warped manifold joints under warm sun exposure or >55°C CIP cycles
Diagnostic Checklists If Something Goes Wrong
Is water dripping out of the union collar nut even when tightened snug?
Common Questions
Schedule 80 vs Schedule 40 UPVC—why use Schedule 80 on RO skids?
Schedule 80 features thicker pipe walls (matching grey color), higher pressure tolerance, and better resistance to pump vibration and chemical cleaning cycles.
How do I remove a pump or valve glued with standard UPVC fittings?
Plan ahead by installing Schedule 80 O-Ring Unions on both sides of pumps, UV units, and control valves so parts lift out cleanly.


