

Hydroplast Grey Solvent 479ml (PVC Jointing Cement)
Hydroplast heavy-duty grey UPVC solvent cement (479ml) cold-welding Schedule 80 commercial RO skid manifolds.
Formulated specifically to chemically fuse Schedule 80 UPVC pressure pipe and fittings into a monolithic leak-proof joint capable of withstanding continuous 100–200+ PSI commercial RO pre-treatment, backwash, and CIP manifolds.
Application Scale & Replacement Verification
Compare housing dimensions, port diameter, and membrane GPD capacity before ordering spares or requesting local dealer quotes. Verify System Fit in Water Planner →
Key Technical Specs
| Manufacturer / Series | Hydroplast |
|---|---|
| Container Volume | 479 ml |
| Application Duty | Commercial / Industrial |
| Piping Specification | ASTM D2467 Schedule 80 Dark Grey UPVC |
Right Fit When
- Schedule 80 and Schedule 40 UPVC pipes and fittings on 250 LPH to 10,000+ LPH commercial RO skids.
- Solvent-welded manifolds, pump suction headers, and FRP valve piping.
When To Skip or Double-Check
- Do NOT use grey PVC solvent cement on white PPR heat-fusion pipe, flexible LLDPE tubing, or threaded NPT joints (solvent melts threads shut permanently).
Signs This Part Is Failing
- Solvent joint slowly weeps under pump startup pressure (dry-spotted or un-primed weld)
- Pipe pushes back slightly out of socket right after assembly before setting
- Lumpy, stringy dried gel inside the can (evaporated solvent from loose lid)
Diagnostic Checklists If Something Goes Wrong
Is water oozing around a freshly glued UPVC collar seam?
Common Questions
How long should Hydroplast grey PVC cement cure before testing a commercial RO plant?
Wait at least 2 hours for low-pressure (<50 PSI) tests and 12–24 hours in cool damp rooms before slamming high-pressure pump discharge headers.
Can you glue threaded UPVC fittings?
No—threaded connections seal with PTFE tape and non-hardening thread sealant; glue only plain socket slip joints.


